First Day: The Kitchen on 9/22/15

IMGP5928

Above the 18×18 crawl space…

IMGP5927

On the left is the header for the Andersen casement kitchen sink window and to the right is the header for the French Doors.

IMGP5934

The header for the kitchen’s box bay window overlooking the patio. John will build a window seat for it.

IMGP5944

Entering from the front door looking toward the kitchen. The 26ft parallam was placed in the living room floor.

A wall will be built dividing the living room and kitchen. French doors will be installed.

IMGP5947

IMGP5937

The east side kitchen wall will have all kitchen cabinets along with the range and dishwasher. I have sketched out a kitchen design.

Next: Day 2

 

 

 

 

Renting a Chipper to Demo a Brick & Block Wall for New Addition

IMGP5828

After John did the demolition of the eastern gable (chimney side triangle), he rented a chipper (last Friday). After he got close to his target demolition, he switched to the chipper to accurately chip away each block and brick rather than using a 30lb sledge hammer that could cause structural damage to the wall below.

IMGP5821IMGP5813

John is using the chipper on the gable to remove all masonry above where the mason has to cut a clean line. Afterwards, the mason will insert bolts to accept the pressure treated 2×8 plate. The eastern plate will be on the same plane as the existing southern plate, installed in 1954. As soon as the plate has been installed, the weight of the new second floor, roof rafters and roof will bear on this plate.

IMGP5819IMGP5870

This photo is after John has chipped the gable off to the precise height that the mason needs in order to keep both plates on the same plane. The inside is easy to cut because it’s block and not brick, but on the exterior, the mason had to cut mid-brick and be very precise.

To the left of the window, John will cut an opening for a second double hung window to be installed.