First Day: The Kitchen on 9/22/15

IMGP5928

Above the 18×18 crawl space…

IMGP5927

On the left is the header for the Andersen casement kitchen sink window and to the right is the header for the French Doors.

IMGP5934

The header for the kitchen’s box bay window overlooking the patio. John will build a window seat for it.

IMGP5944

Entering from the front door looking toward the kitchen. The 26ft parallam was placed in the living room floor.

A wall will be built dividing the living room and kitchen. French doors will be installed.

IMGP5947

IMGP5937

The east side kitchen wall will have all kitchen cabinets along with the range and dishwasher. I have sketched out a kitchen design.

Next: Day 2

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *

*