Lower East Side is Finished

image

John finished the lap siding on the lower east side. The soffit is on order and will be arriving very soon. When it’s delivered, it will be slipped into position and covered by 1×8.

The lap siding boards are 8 1/4 which allowed for a 7″ reveal. The corner boards are 5  1/4 x 6 nailed together (stainless steel nails).